省政府抓住国家“西部在开发”战略的有利形势 ,适时提出培育我省以水电为主的第五大支柱产业的重大决策 ,确定的“西电东送”电源方案“三水五火”中 ,“三水”—小湾、糯扎渡、景洪三个大型、巨型电站建设周期长 ,排在首先开发的小湾电站最快要到 2 0 10年才能投产 ,在此之前
The provincial government seized the favorable situation of the strategy of “developing western China” and put forth timely major policies for fostering the fifth pillar industry in our province, focusing on hydropower. The provincial power supply plan “Sanshuiwuhuo” In the “Sanshui” - Xiaowan, Nuozhadu, Jinghong three large, giant power plant construction period is long, ranked first in the development of Xiaowan power plant as soon as possible in 2010 to put into operation, before