云南金沙江中游电站送电广西直流输电工程(简称金中直流工程),是南方电网公司“十二五”期间继“两渡”直流工程之后又一重大“西电东送”项目,也是国内首条落点广西的直流输电工程。线路全长约1106.762千米,工程建成后将对保障云南水电送出、满足广西用电负荷增长需要发挥重要作用。工程共16个线路施工标段,由云南省送变电工程公司承担施工任务的8标段,施工区域起于曲靖市师宗县,途径罗平县,止于广西西林县马蚌乡,线路长度67.936千米,铁塔164基。
Yunnan Jinsha River Power Station Transmission Guangxi HVDC Transmission Project (referred to as the Golden DC Project), is the China Southern Power Grid Company “Twelve-Five ” period following the “two-crossing ” DC project after a major "Project, but also the first drop in Guangxi DC transmission project. The total length of the line is about 1106.762 km. After the completion of the project, it will play an important role in guaranteeing the delivery of hydropower in Yunnan Province and meeting the needs of Guangxi power load growth. Construction of a total of 16 lines of the project tenders, transmission and transformation projects in Yunnan Province to undertake the construction project 8 tenders, the construction area started in Shijiazhuang Qujing, Luoping County, ending in Ma Linxiang County, Guangxi, the length of the line 67.936 km, tower 164 base.