某艇扫雷集控与检测装置是以PC/104为核心的采集、控制、显示系统,能够实现对1台扫雷柴油机和2台扫雷空压机的工况进行实时监测、控制及超限报警指示和智能应急处理。通过关键路径法(CPM),确定了该项目的关键路径,通过项目评价和评审技术(PERT),采用乐观、悲观、常规3种情况及数学模型对完成项目进行历时估算,得出在项目工期前完成项目的可能性。
A maneuvering maneuvering control and detection device of a ship is a collection, control and display system based on the PC / 104, which realizes the real-time monitoring, control and overrun alarm indication on the working conditions of a demining diesel engine and two demining air compressors And smart emergency treatment. Through the critical path method (CPM), the critical path of the project was identified. Through the Project Evaluation and Evaluation Technology (PERT), optimistic, pessimistic and routine three kinds of mathematical models were used to estimate the completion of the project. Possibility of completing the project before.