三峡水电站的水轮发电机组单机容量70万 kW,属特大型机组。水轮发电机组以及水电站的电器设备,有些部件的单件运输重量在100t 以上;个别部件的单件运输重量达500t,其体积迭(长×宽×高)10.25m×10.25m×5.95m。如此重大的运输单件用常规的运输和起吊手段是不能将其运到安装地点的。本文介绍了三峡工地的内外交通条件,以及水电站水轮发电机组的重型部件数据及运输和起吊手段。对从事起重运输及水电站建设规划者是一份很好的参考资料。
Three Gorges hydroelectric generating unit hydroelectric power generation capacity of 700,000 kW, is a very large unit. Hydroelectric generating sets and electrical equipment of hydropower stations, some parts of a single transport weight of 100t or more; individual parts transport weight of 500t, its volume Diego (L × W × H) 10.25m × 10.25m × 5.95m. Such a major shipping unit can not be shipped to the installation site using conventional means of transport and lifting. This article introduces the internal and external traffic conditions of the Three Gorges Project site as well as the data of heavy components and the means of transportation and lifting of hydroelectric generating units of hydropower stations. For lifting and transportation and hydropower station construction planning is a good reference.