东黄输油管线寿光至潍坊段,穿越桂河的250米是采用φ529×8毫米,外加φ720毫米的套管并以增注水泥沙浆的结构形式埋地敷设的。1984年以来,这段管线因内部腐蚀穿孔,导致套管连续6次漏油,其中两次发生在注浆口及排气口封头部位,其它均发生在φ720毫米螺纹管两端的封头焊缝部位。因增注水泥沙浆的套管不承受工作压力,每次补焊不仅因停输而影响正常生产,而且总不能彻底根治。经石油部管道局和胜利输油公司研究,决定采取不停输封堵换管的办法。
The East Yellow Pipeline Shouguang to Weifang section, through the River Kwai 250 meters is the use of φ529 × 8 mm, plus φ720 mm casing and grouting to increase the structure of cement mortar buried underground layout. Since 1984, this pipeline has been punctured due to internal corrosion, causing the casing to leak oil continuously for 6 times, of which two occurred in the grouting port and the exhaust port sealing head. The other occurred in both ends of the φ720 mm threaded pipe Weld site. Due to the increase of cement mortar casing do not withstand the pressure of work, each repair welding not only affect the normal production due to stop transportation, and can not be completely radical. Oil Pipeline Bureau and the victory of the oil company research, decided to take the non-stop transport tube plugging approach.