论文部分内容阅读
主要介绍了CTCS-3级列车运行控制系统中逻辑控制部分的核心设备计算机联锁(CBI)与无线闭塞中心(RBC)接口的工作方式、通信安全控制技术以及实现方法。
This paper mainly introduces the working methods of CBI and RBC interface in the logic control part of CTCS-3 train operation control system, the communication security control technology and its implementation.