我队按装工作为适应生产跃进的需要,创造并推广了电动机按塔上的方法,它既能減小地盘缩小场房,且搬迁装拆轻快方便。我队现在所使用16.5米斜塔的鑽埸,其前后场房全部取消了,使用12.5米斜塔的缵埸,其后埸房取消了。关于机械的具体按装方法,如图所示。中间轴、鑽机和水泵的位置基本不变,只
Our team installed work in order to meet the needs of the production leap forward, created and promoted the motor according to the method on the tower, which can reduce the site to reduce the housing, and removal and assembly and disassembly quick and easy. The drill rigs of the 16.5-meter Leaning Tower that our team is currently using have all been canceled before and after the use of the 12.5-meter inclined tower. The mortuary room was subsequently cancelled. About the specific installation method of the machine, as shown in the figure. The position of the intermediate shaft, drilling rig and water pump remains basically unchanged.