论文部分内容阅读
详细介绍了武隆隧道浅埋穿越既有建筑物施工中所采用的隧道开挖、钻爆设计、既有建筑物桩基处理以及施工监控量测等技术措施。
The technical measures of tunnel excavation, design of drilling and blasting, pile foundation treatment of existing buildings and monitoring of construction monitoring are introduced in detail in the construction of Wulong tunnel through the existing buildings.