上海新客站上海新客站由华东建筑设计院设计,上海市第五建筑工程公司总承包施工,上海市工业设备安装公司承建设备安装。站舍在国内首次采用“高架候车、南北开口”的布局,高架部分以中间廊道为中心,跨越7个站台,对称布局,大候车厅。候车室总面积近14 000m~2,候车椅12000个,是全国最大的。客站基础有桩基、
The Shanghai New Passenger Station Shanghai New Passenger Station is designed by the East China Architectural Design Institute. The Shanghai Fifth Construction Engineering Company has been contracted and the Shanghai Industrial Equipment Installation Company has undertaken the construction of equipment installation. For the first time in the country, the station adopts the layout of “elevated waiting and north-south opening”. The elevated part centers on the middle corridor, spans seven platforms, and has a symmetrical layout and a large waiting room. The waiting area has a total area of nearly 14 000 m 2 and 12,000 waiting chairs. It is the largest in the country. The base of the station is pile foundation,