论文部分内容阅读
第二炼钢厂空压站冷却水最初设计为直排式用水方式 ,为了节约用水曾三次对其供水工艺进行改造 ,达到了节水的目的 ,保证了设备的正常运行 ,经济效益显著。
The cooling water of the air compressor station of the second steelmaking plant was originally designed as an in-line water supply mode. In order to save water, the water supply process has been restructured three times to save water and ensure the normal operation of the equipment with remarkable economic benefits.