我厂的一台湿式TRT发电装置,是上海汽轮机厂制造的第一台产品,型号MPT-1.0/4.5-1.7型,功率为1700kW,1984年12月投运至今,累计共运行二万四千多小时,发电三千多万度,取得了良好的经济效益。 湿式TRT发电装置是钢铁企业中的一种新型节能发电装置。我国是从80年代初开始研制并应用高炉煤气发电这项新技术的。从我厂运行情况来看,影响TRT正常运行和发电的主要因素有二:一是高炉煤气的含尘量较高,致使TRT的通流
I plant a wet TRT power plant, the Shanghai Steam Turbine Factory is the first product manufactured, model MPT-1.0 / 4.5-1.7 type, power 1700kW, put into operation in December 1984 so far, a total of running a total of 24,000 More than an hour, generating more than 30 million degrees, and achieved good economic returns. Wet TRT power generation plant is a new type of energy-saving power generation device in iron and steel enterprises. Our country started from the early 80’s to develop and apply this new technology of blast furnace gas power generation. From the operation of our plant point of view, the main factors that affect the normal operation of TRT and power generation are two: First, high dust content of blast furnace gas, resulting in the flow of TRT