白山水电站一期3台300MW水轮发电机组布置于地下式厂房内,自20世纪80年代相继投产运行,机组的主要设备及部件均由哈电生产。发电机的定子线棒在多年的运行当中已逐渐劣化,线棒绝缘时常发生故障。当发生定子线棒绝缘击穿事故时,就需要更换备品线棒,这将使发电机被迫停止运行或延长检修的时间,给生产带来很大损失,为此我们应该努力提高运行、检修的质量,以减少这种事故的发生。而当发生这种事故后,又应尽快地恢复。
Baishan Hydropower Station Phase I 300MW hydroelectric generating units arranged in the underground plant, since the 20th century, have been put into operation in the 1980s, the main unit of the unit and components are produced by the HEC. The stator bar of the generator has gradually deteriorated during years of operation, and the bar insulation often fails. When the stator bar insulation breakdown occurs, the need to replace the spare wire rod, which will make the generator was forced to stop running or extended maintenance time, causing great losses to production, for which we should strive to improve operation and maintenance The quality to reduce the incidence of such accidents. When such an accident occurs, it should be resumed as soon as possible.