一、对象选择 (一)选择依据 选择东方第二代大型300MW汽轮发电机为我厂开展价值工程工作的重点,主要是因为: 1.该产品需求量大,“八五”期起国家年需求量达20—30套。
I. Object Selection (I) The basis for choosing the largest 300MW turbo-generator of the second generation of the East to carry out value engineering work for our plant is mainly because: 1. The demand of the product is large, and the national year from the “Eighth Five Year Plan” period Demand of 20-30 sets.