某供水站二期工程扩大制水量工程改造的方案浅析

来源 :厦门科技 | 被引量 : 0次 | 上传用户:i4majia
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
改造前的水力计算1.对目前最大制水能力的水力估算制水系统的最大供水能力实际为每小时最大制水量乘以24扣除自用水量后为制水系统的供水能力,但由于供水有高峰、低谷之分,且清水池的最大容量有限,所以制水系统不能以理想状态每小时都是在最高负荷的情况下运行,高峰、低谷供水量变化系数较大,为了验证供水站二期系统的实际最大制水能力,于9月15日23:15~16日6:15 Hydraulic calculation before retrofitting 1. Hydraulic estimation of current maximum capacity of water system The maximum water supply capacity of the water system is actually the maximum capacity per hour multiplied by 24 for the water supply capacity of the water system after deducting the amount of self-used water. However, due to the peak of water supply , The trough, and the maximum capacity of the water reservoir is limited, so the water system can not be the ideal state every hour under the maximum load operation, the peak, trough water supply coefficient of variation, in order to verify the water supply station two systems The actual maximum water capacity at 23:15 on September 15 6:15
其他文献
This paper is devoted to the problem of modeling and adaptive motion/force tracking for a class of nonholonomic dynamic systems with affine constraints(NDSAC):
为探究吕家坨井田地质构造格局,根据钻孔勘探资料,采用分形理论和趋势面分析方法,研究了井田7
为探究吕家坨井田地质构造格局,根据钻孔勘探资料,采用分形理论和趋势面分析方法,研究了井田7
为探究吕家坨井田地质构造格局,根据钻孔勘探资料,采用分形理论和趋势面分析方法,研究了井田7
期刊
This paper establishes the relation between APLs and direct input coefficients through Sherman-Morrison formulation.On such a basis,elasticity matrix can be cal
你能估计自己的身高吗?你所坐的课桌面积是多少?一堆稻谷的体积有多少?它约等于多少千克?相信没有几个学生能够说出答案。在当今的数学教学中教师往往只注重逻辑思维能力的培养而忽略对直觉思维能力的培养。不能不说,忽视直觉思维能力的培养是旧的教学模式的一个缺陷。爱因斯坦说:“直觉是发明中的头等重要的东西。”直觉往往产生于实验、观察、联想,类比和归纳的基础上。由此可见,培养学生的直觉思维是很有必要的。    
中小企业施行ERP存在资金较少,信息人才匮乏。管理基础薄弱,不断转型规模扩张等特点,针对这些特点,中小企业需要个性化、“可成长”的ERP。条件具备的企业要不失时机地施行ERP管
以相邻2次地震的时间间隔作为统计量,对华北地区的地震活动异常平静进行了统计检验.统计结果表明,中小地震的时间间隔服从幂指数分布.对华北地区而言,中强地震之前大范围内中
新闻集团“窃听门”丑闻不断升级,继停刊的《世闻新闻报》之后,《太阳报》也传出因涉嫌不正当操作而有关门危机。此类事件不仅暴露了媒介组织道德上的脆弱,更显示了深埋其的“生