我矿是大型露天铁矿,经过穿爆铲装等工艺过程,有大量的采剥矿岩量运出,因此,台阶工作面也就相应的向前推进。为了及时地反映出生产的进行情况和采剥的矿岩量,矿山地测部门每月要对各台电铲所在的工作面进行一次验收测量,并根据结果绘制露天矿采剥工程综合平面图,作为编制采矿技术计划和企业管理的重要资料,而由验收测量结果计算出来的验收量,是衡量完成国
Mine is a large open-pit iron mine, after wearing blasting equipment such as blasting process, a large number of mining stripping mine out of the amount of ore, therefore, the step face will also move forward accordingly. In order to timely reflect the progress of production and exploitation of mine rock, mining geology department every month on the shovel where the work surface to conduct an acceptance test, and based on the results of drawing open-pit mine mining stripping comprehensive plan, as Preparation of mining technology plans and business management of important information, and acceptance test results calculated by the acceptance of the country is to measure the completion of