加快建设速度、缩短施工周期,提高工程的综合经济效益是基本建设一个极为重要的课题.要实现以上目标,最关键的工作就是统筹安排工程进度,科学地组织施工,使一项过程复杂、纵横交错,多单位、多专业、多工种参加建设的工程项目按客观条件加以系统化、条理化、科学化,从而达到均衡施工、多快好省地目的.近年来,我们从施工准备、《施工组织设计》的编制,到各专业队伍的安排,从总体到局部,全面推广应用网络技木、统筹安排、合理施工,使在建项目取得速度快、质量好、成本低、工效高的显著成效.高速线料工程是马钢公司“七五”期间实现二百万吨线材的重点配套工程,也是冶金
Accelerating the construction speed, shortening the construction period and improving the overall economic efficiency of the project are an extremely important issue for the capital construction. To achieve the above objectives, the most critical task is to plan the progress of the project in an integrated manner and scientifically organize the construction so that a process is complex and vertical and horizontal. Intertwined, multi-unit, multi-professional, and multi-industry construction projects are systematically, systematically, and scientifically based on objective conditions, so as to achieve balanced construction and save more land. In recent years, we have prepared for construction and construction. “Organization Design” has been compiled to the arrangements of various professional teams. From the overall to the local, comprehensive promotion of the use of network technology, overall planning and rational construction has been made, so that projects under construction have achieved remarkable results with high speed, good quality, low cost and high ergonomic efficiency. High-speed wire and materials engineering is a key supporting project for the realization of 2 million tons of wire rods during the “7th Five-Year Plan” period of Masteel, and is also a metallurgical