论文部分内容阅读
一、水口水电站是国家投资、世界银行贷款的华东最大水电站的建设项目福建省水口水电站正式于1987年3月7日开工,该站是华东地区最大的水电站,也是国家“七五”期间头两年开工百万千瓦级七个水电站之一(其他六个是:五强溪、漫湾、二滩、李家峡、天生桥一级、隔河岩水电站),水口水电站装机容量为140万千瓦,是以发电为主兼有航运等综合效益工程,为国家“七
First, the Shuikou Hydropower Station is a national investment, the World Bank loan East China’s largest hydropower station construction project Fujian Shuikou Hydropower Station officially started in March 7, 1987, the station is the largest hydropower station in East China, but also the country “seven five” during the first two In one million kilowatts of water power stations started one of the seven (the other six are: Wuqiangxi, Manwan, Ertan, Lijiaxia, Tianshengqiao level, Geheyan Hydropower Station), Shuikou Hydropower Station installed capacity of 1.4 million kilowatts, so Power-based both shipping and other comprehensive benefit projects for the country "seven