论文部分内容阅读
鹤地水库第二溢洪道闸门主横梁是预应力混凝土,小次梁及支臂则采用钢筋混凝土结构。为减轻闸门重量及增强面板抗震能力,面板采用钢丝网水泥沙浆结构。
The main beam of the second spillway gate of Hedi Reservoir is prestressed concrete, while the minor beam and the support arm are reinforced concrete structures. In order to reduce the weight of the gate and enhance the panel seismic resistance, the panel uses steel mesh cement mortar structure.