An insight into the removal of fluoroquinolones in activated sludge process: Sorption and biodegrada

来源 :环境科学学报(英文版) | 被引量 : 0次 | 上传用户:fat1984yy
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
The detailed sorption steps and biodegradation characteristics of fluoroquinolones (FQs) including ciprofloxacin,enrofloxacin,lomefloxacin,norfloxacin,and ofloxacin were investigated through batch experiments.The results indicate that FQs at a total concentration of 500 μg/L caused little inhibition of sludge bioactivity.Sorption was the primary removal pathway of FQs in the activated sludge process,followed by biodegradation,while hydrolysis and volatilization were negligible.FQ sorption on activated sludge was a reversible process goved by surface reaction.Henry and Freundlich models could describe the FQ sorption isotherms well in the concentration range of 100-300 μg/L.Thermodynamic parameters revealed that FQ sorption on activated sludge is spontaneous,exothermic,and enthalpy-driven.Hydrophobicity-independent mechanisms determined the FQ sorption affinity with activated sludge.The zwitterion of FQs had the strongest sorption affinity,followed by cation and anion,and aerobic condition facilitated FQ sorption.FQs were slowly biodegradable,with long half-lives (>100 hr).FQ biodegradation was enhanced with increasing temperature and under aerobic condition,and thus was possibly achieved through co-metabolism during nitrification.This study provides an insight into the removal kinetics and mechanism of FQs in the activated sludge process,but also helps assess the environmental risks of FQs resulting from sludge disposal.
其他文献
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
期刊
期刊
1 采收花椒成熟期通常在立秋前后。采摘过早,不仅色泽暗淡,香味欠佳,而且麻味也差;采摘过迟,又容易落粒和裂嘴,若遇雨水灌果,会发霉变质;采收适期的花椒果皮全部变红,皮上的
期刊
该文从挂篮荷载计算、施工流程、支座及临时固结施工、挂篮安装及试验、合拢段施工、模板制作安装、钢筋安装、混凝土的浇筑及养生、测量监控等方面人手,介绍了S226海滨大桥
隐患:渔船渔网蚕食航道惠州港现有码头14座,泊位29个,万吨级泊位16个,其中30万吨级泊位2个,15万吨级泊位2个,每天有300余艘船舶进出港,每周约有5~6艘15万吨以上的大型油轮进