论文部分内容阅读
我矿张伏山破碎厂原设计为三段一闭路的工艺流程,只能生产粒度10-0毫米的粉矿。为使高炉吃饱吃好,提高矿石资源的利用率,破碎厂的广大职工提出改三段一闭路流程为二段开路流程,生产武钢高炉急需的块矿。按照常规应再建一个皮带机通廊,安装一条皮带机,这样投资多,工期长,施工困难。工人师付们破除迷信,解放思想,提出要架一条钢丝绳皮带机。在机修师付的紧密配合和大力支持下,经过二十多天的奋战,建成了长达56米的钢丝绳悬撑支架皮带机。实现破碎工艺既能二
I mine Zhang Fu Shan crushing plant was originally designed as a three-section closed loop process, can only produce 10-0 mm particle size ore. In order to eat the blast furnace well and improve the utilization rate of ore resources, the majority of workers in the crushing plant put forward the procedure of changing section three-closed circuit into section two open flow and producing block ore urgently needed by WISCO blast furnace. In accordance with the routine should be rebuilt a belt conveyor corridor, the installation of a belt conveyor, so more investment, long construction period, construction difficulties. Workers who pay to get rid of superstition, emancipate the mind, proposed to be a rope belt machine. In close cooperation with the mechanic to pay and strong support, after more than 20 days of fighting, built up to 56 meters of rope suspension bracket belt machine. To achieve both crushing process II