厦漳跨海大桥北汊主桥为主跨780m的半漂浮体系双塔双索面斜拉桥。北汊主桥共有平行钢丝斜拉索25组(25×4×2=200根),单索最长为408.5m,重32.5t,梁端锚固结构为锚拉板,塔端锚固结构为钢锚梁。根据安装方式不同,将斜拉索分为短索和长索两种。短索采用塔端硬牵引方式:塔端安装-安装张拉杆下放-梁端压锚-张拉,长索采用塔端软牵引方式:塔端锚杯安装软牵引钢铰线-塔端挂设和展索-梁面展索-梁端压锚(最大压锚索力小于30t)-软牵引初张拉-硬牵引终张拉;采用梁端控制压锚索力,塔端软牵引并增加钢铰线的数量,充分降低了安全风险,长度在320m的斜拉索安装效率为1.5根/天。
Xiamen Zhangzhang Sea Bridge North Beijiao main bridge-based semi-floating system of 780m double-tower double cable plane cable-stayed bridge. Beijiao main bridge has a total of 25 pairs of parallel steel cable (25 × 4 × 2 = 200), the longest single cable is 408.5m, weighs 32.5t, the beam end anchorage structure is anchor plate, the tower end anchorage structure is steel Anchor beam. According to different installation methods, the cable will be divided into two kinds of short cable and long cable. Short cable tower hard traction method: tower installation - installation of tension rod decentralization - beam end anchor - tension, long cable tower using the end of the soft traction method: tower anchorage cup installation of soft traction steel hinge - tower hanging And cable extension - Beam extension - Beam end anchor (maximum anchor pressure less than 30t) - Soft start pull - Hard end pull; Beam end control Pressurized anchor force, tower end soft pull and increase The number of steel hinges fully reduces the safety risk. The installation efficiency of the stay cables with a length of 320m is 1.5 pieces / day.