论文部分内容阅读
顶吹转炉吹炼过程的温度控制,是操作中心环节之一。温度对于熔池化学反应进行的速度有决定性的意义。炼钢工作者都在竭力摸索转炉吹炼过程温度的变化规律。连续测温攻关小组与三炼钢厂的工人、干部、技术人员互相配合,共同在150吨转炉进行了炉衬埋入热电偶连续测温的现场试验,取得了一定成绩。本文根据连测结果,对转炉吹炼过程中的钢液温度和炉衬
Top blowing converter blowing temperature control process, is one of the operational links. The temperature is of decisive importance for the speed of the chemical reaction in the bath. Steel-making workers are trying their best to find out the change rule of the temperature in converter blowing process. Continuous temperature measurement team and the third steel mill workers, cadres and technicians work together in a 150-ton converter furnace lining embedded thermocouple continuous temperature field test and achieved some success. In this paper, according to the results of continuous measurement, the temperature of the molten steel during the converter blowing and lining