为了增强山东电网调峰能力,优化电源结构,改善电网运行条件,促进当地经济和社会的发展,2012年12月20日,国家发展改革委以发改办能源〔2012〕3596号文复函山东省发展改革委、国家电网公司,同意山东沂蒙抽水蓄能电站开展前期工作。山东沂蒙抽水蓄能电站初定建设4台30万kW的立轴单级混流可逆式机组,总装机容量120万kW,项目由国家电网公司全资建设,中国水电顾问集团北京勘测设计研究院负
On December 20, 2012, the National Development and Reform Commission used the letter No. 2012 [2012] of the National Development and Reform Commission to reply the document No. 3596 of Shandong Province, Shandong Province for the purpose of enhancing the peak regulation capability of Shandong Power Grid, optimizing the structure of power supply, improving the operating conditions of the power grid and promoting the local economy. Provincial Development and Reform Commission, State Grid Corporation, agreed to Yimeng Pumped Storage Power Station to carry out preparatory work. Shandong Yimeng Pumped Storage Power Station initially planned to build 4 sets of 300MW vertical axis single-stage mixed flow reversible units with a total installed capacity of 1.2 million kW. The project was wholly-owned by State Grid Corporation of China and Beijing Hydropower Engineering Consulting Group China Survey and Design Institute