挑流消能是目前泄流消能的一种重要方式,其挑坎下游消能工的布置和选型,对消能效果和消能率有非常重要的影响,同时也关系到工程整体的安全。通过一个实际工程,对溢洪道下游挑坎后的消能工布置进行优化,通过对原设计方案、水垫塘方案、挑坎下移方案对下游流态、流场、冲坑进行比较试验,从而对消能效果、坝脚和岸边流速及下游河道抗冲能力进行评价。研究表明,原方案中存在消能效率低、坝脚和岸边流速过大的问题,水垫塘方案解决了坝脚回流和对岸冲刷问题,但仍然存在水舌冲刷本岸边坡的问题,而在挑坎下移方案中这些问题均得到了较好的解决,因此推荐为本工程的最终泄洪消能布置方案。其成果对挑流消能下游消能工型式的选择和布置具有一定的借鉴作用。
Energy dissipation is one of the most important ways to dissipate energy and dissipate energy at present. The layout and selection of energy dissipators downstream of the energy diversion have a very important influence on the energy dissipation and energy dissipation rate. At the same time, it is also related to the overall safety of the project . Through a practical project, the energy dissipater arrangement in the downstream of the spillway can be optimized. By comparing the design of the original design, the plan of the cushion pool and the diverting move, the downstream flow field, the flow field and the red pit can be compared and tested The energy dissipation effect, dam foot and shore flow velocity and the downstream river impact resistance were evaluated. The research shows that the original scheme has the problems of low energy dissipation rate and excessive flow velocity at the dam foot and bank. The plunge pool solution solves the problem of backflow and erosion of the dam foot, but there is still the problem that the water tongue scour the shore slope. However, all of these problems have been solved well in the downward plan of the pick-up-taker. Therefore, it is recommended that this project be the final flood-discharge energy-saving layout plan. The results have a certain reference for the selection and arrangement of energy dissipation type downstream energy dissipators.