水利水电企业实施ISO9000的难点和对策

来源 :水利水电标准化与计量 | 被引量 : 0次 | 上传用户:noonbird
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
针对水利水电企业现行质量管理现状和特点,系统地分析和论述了实施 ISO 9000存在的问题、难点以及解决这些问题、难点所采取的对策,并对水利水电企业实施 ISO 9000应纳入水利体制改革总体规划和结合改善企业经营机制、建立现代企业制度进行了说明。 According to the current quality management status and characteristics of water conservancy and hydropower enterprises, this paper systematically analyzes and discusses the existing problems and difficulties in implementing ISO 9000 and the countermeasures to solve these problems and difficulties. The implementation of ISO 9000 for water conservancy and hydropower enterprises should be included in the overall water conservancy system reform Planning and combination of improving the business mechanism, the establishment of a modern enterprise system were described.
其他文献
高职院校生源渠道广阔,学生素质存在较大差异,数学课程教学进度和质量自然饱受约束。在信息资源环境日渐完善背景下,为了全面整改以往落后教学模式并为高职高数教学前景合理
班主任进行班级管理要相信、尊重学生,要实施科学民主的管理方法;要有耐心、爱心、责任心还要懂得付出,除此之外一定要讲究时效性和成效性,二者结合才能完整带好一个班并有成
请下载后查看,本文暂不支持在线获取查看简介。 Please download to view, this article does not support online access to view profile.
Two types of granitic intrusives occur in the lower Paleozoic strata in north Qilian. One is the hornblende- bearing granitic body in Jingzichuan, characterized
埋地金属管线对视电阻率的观测危害甚大。造成观测值大幅改变,跳动,无规律可循。严重时,甚至台站报废,被迫搬迁。通过一些突发事件的启发,结合现场实验,并引证了一些理论计算
2003年12月1日在中国与哈萨克斯坦交界处发生了MS6.1级地震。震前,位于震中西南224 km的新疆 乌什台分量式钻孔应变仪记录到了明显的应变异常信息。经多次落实没有发现干扰,
A consecutive sediment core (CC2) was drilledin Chen Co (lake) of southern Tibet using a PISTON samplerin 1998 AD. Cladoceran remains including their species,am
计算机专业教育主要以培养具备专业知识技能和实践能力学生为目标,在教育改革背景下,转变教师角色,以行为导向教学法为导向,尊重学生的主体地位,充分发挥学生的创造能力和思
The detailed electrical conductivity measure- ment (ECM), trace chemical compositions and microparti- cles concentration analysis are performed for BH8 ice core
Calibration of seismic reflectors appearing in the crust of the Chinese continent sci- entific drilling site can be completed through the correlation studies be