论文部分内容阅读
基于无线传感网络对杭州市民中心高空连廊吊装施工过程进行了远程监测研究。详细介绍了远程监测系统的组成和工作原理,以及远程监测过程和主要监测结果。对施工过程中的应变监测数据和吊装设备控制参数比较表明,监测系统可以有效地反映吊装过程中的结构性态。最后,对施工阶段的温度和应变监测数据进行相关性分析,以了解吊装阶段、支座条件以及温度对结构构件应变的影响,评估吊装过程的稳定性。
Based on the wireless sensor network, Hangzhou Civic Center elevated corridor hoisting construction process conducted a long-range monitoring study. Details the composition and working principle of the remote monitoring system, as well as the remote monitoring process and the main monitoring results. The comparison between the monitoring data of the strain during the construction and the control parameters of the hoisting equipment shows that the monitoring system can effectively reflect the structural state of the hoisting process. Finally, the correlation analysis of temperature and strain monitoring data during the construction phase is carried out to understand the influence of lifting stage, bearing conditions and temperature on the strain of structural members, and to evaluate the stability of hoisting process.