今年以来,鄂城市采石厂生产蒸蒸日上,实现了月月红、季季红、全面红,到11月28日,石灰石产量已完成全年计划的102.1%,比去年同期增长3.19%,产值完成全年计划的103.9%,上交利润完成全年计划的116.6%,比去年同期增长9.4%,材料消耗比去年下降30.7%,成本比去年下降24%,劳动生产率平均比去年提高131.6%,生产工人由去年底347人减到241人,行政人员由41人减到14人,共节约127人去支援农业生产和兄弟厂矿,实现了增产又减人.在技术革新方面,先后共革新了生产工具和操作方法18项,平均提高工效150%.
Since the beginning of this year, Echeng quarry production has been booming. It has achieved monthly red, seasonal red and overall red. By November 28, the output of limestone has completed 102.1% of the annual plan, an increase of 3.19% over the same period of last year, and the output value has been completed The annual plan 103.9%, turned over profits to complete the annual plan 116.6%, 9.4% more than last year, material consumption dropped 30.7% over last year, the cost dropped 24% over last year, labor productivity increased by an average of 131.6% over last year, production The number of workers was reduced from 347 to 241 by the end of last year, and the number of administrative staff reduced from 41 to 14, saving a total of 127 people in supporting agricultural production and brother factories and mines, thus increasing production and reducing manpower. In technological innovation, 18 tools and methods of operation, an average of 150% increase in efficiency.