论文部分内容阅读
金属罐是贮水常用的容器.而金属腐蚀是普遍的、大量的.腐蚀与防护科学是本世纪30年代发展起来的一门综合性学科.大庆油田目前已有各种容器6000多座,1997年因腐蚀改造更新的费用高达14573万元,而因腐蚀造成的停产等间接性损失更是惊人.由黑龙江省庆达水利水电工程公司承建的,大庆石油管理局采油二厂南四污水站改造工程就是以防腐改造为主,站内容积在200m~3~2000m~3之间的滤罐、油罐、除油罐及水罐腐蚀、老化严重,需要重新做内、外防腐,经过公司上下各工种协调施工,终于按工期圆满完成.现就施工过程中影响涂层性能的主要因素谈谈看法,愿供参考.
Metal cans are commonly used containers for water storage. Metal corrosion is widespread and numerous. The science of corrosion and protection is a comprehensive discipline developed in the 1930s. There are currently more than 6,000 containers of various types in Daqing Oilfield, 1997. The annual cost of renovation and renovation was as high as 145.73 million yuan, and the indirect loss due to corrosion was even more alarming. It was built by Heilongjiang Province Qingda Water Conservancy and Hydroelectric Engineering Company, and the South Fourth Sewage Treatment Station of Daqing Petroleum Administration No. 2 Oil Refinery was renovated. The project is mainly based on anti-corrosion renovation. The canisters, oil tanks, degreasing tanks, and water tanks with an internal volume between 200m~3~2000m~3 are corroded and have serious aging, and need to be re-applied internally and externally. Coordinating construction work, and finally completed in accordance with the duration of the project. Now on the construction process of the main factors affecting the performance of the coating to talk about the views and is willing to provide reference.