论文部分内容阅读
2005年,安庆石化“油改煤”工程建设进入冲刺时期,为确保工程建设各类物资按计划和时间节点顺利到厂,安庆石化物资供应中心在全国各地打响了设备监造和催交催运攻坚战。在这支催交催运的大军中,设备室计划员吴迎春榜上有名,被派往江西江联厂进行设备监造。此次出征前,吴迎春一开始并没有想到时间会太久,她告诉正面临期中考试的女儿和家人,十天半个月一定会回来,可谁知,一去就是两个多月。在这两个多月里,她会遇到什么难题呢?
In 2005, Anqing Petrochemical “oil to coal ” project construction into the sprint period, in order to ensure that all types of construction materials in accordance with the schedule and time node smoothly to the factory, Anqing petrochemical material supply center throughout the country started equipment supervision and reminder Rush fortitude battle. In this reminder of the army, the equipment room planner Wu Ying-hsun was on the list and was sent to Jiangxi Jianglian plant for equipment supervision. Before the expedition, Wu Yingchun did not expect the first time will be too long, she told the daughter and family are facing the midterm examination, ten days and a half months will certainly be back, but who knows, one to go is more than two months. In these two months, she will encounter any problems?