论文部分内容阅读
现行的水电工程与水利工程在造价管理计费标准上存在着明显的差异,基本状况足水利工程标准低于水电工程标准,相比之下,水利工程在造价管理方面存在着信息滞后,颁布法规延迟,执行时间滞后,勘测设计收费标准与水电工程不同步;费用偏保守,标准偏低。建议适当降低水利工程贷款利率;适当提高利润率;限制名目繁多的不合理税费;计费标准应与水电工程大致同步、同水平。
The existing hydropower projects and water conservancy projects in cost management billing standards there is a clear difference, the basic status of sufficient water conservancy project standards lower than the hydropower project standards, compared to water conservancy projects in the cost management there is information lag, enactment of laws and regulations Delay, execution time lag, survey and design charges are not synchronized with the hydropower project; the cost of partial conservative, low standards. It is suggested that the loan interest rate of water conservancy projects should be appropriately reduced; the profit rate should be appropriately raised; the unreasonable taxes and fees subject to a great variety of names should be limited; and the charging standard should be roughly synchronized with that of hydropower projects.