编制露天矿逐年剥采工程进度计划是露天矿设计过程中关键的一步。参考国外的经验,研究符合我国实际情况的使用电子计算机编制露天矿逐年剥采工程进度计划的方法,是当前露天矿最佳设计和现代化生产管理的一项重要任务。本文提供一种符合我国矿山生产工艺过程的直接实用方法。用此方法编制的程序对露天矿进行了实例计算。矿体模型由方块构成的矿体模型是目前使用电子计算机进行露天矿最佳设计的基本模型。露天矿的剥采过程,实际上是按照一系列的约束条件,从露天矿境界内分批取出物料,所
The preparation of open-pit mining project stripping progress schedule is a key step in the design process. With reference to the experience of other countries, it is an important task for us to study the method of preparing the progress plan of stripping a mining project year by year by using an electronic computer in line with the actual situation of our country. It is an important task for the optimal design and modern production management of the open pit mine. This article provides a direct and practical method that is in line with China's mine production process. The program compiled by this method is used to calculate the open pit mine. Orebody Model The orebody model composed of cubes is the basic model for the optimal design of open pit mine using electronic computers. Strip mining process in open-pit mines, in fact, is in accordance with a series of constraints, from the open-pit mines in batches of material removed,