北京地铁9号线白石桥南站围护及盾构调头设计

来源 :铁道建筑技术 | 被引量 : 0次 | 上传用户:sddcx
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
主要从三个方面对白石桥南站围护即盾构调头设计进行了总结:(1)对换乘节点大尺寸基坑的两种主要设计方案进行了比选,指出了它们各自的优缺点;(2)车站施工场地狭小,通过合理的基坑开挖步序安排,有效地解决了施工场地不足的问题;(3)受车站施工场地及车站上方高压线的限制,大型起重设备无法安装,盾构调头只能在车站内进行,对站内调头方案进行了详细介绍,并指出了该方案的设计要点。 Mainly from three aspects of the Baishiqiao South Station shield that is U-turn shield design: (1) The two major design options for large-size foundation pit transfer were compared, pointing out their respective advantages and disadvantages ; (2) The construction site of the station is small and the excavation sequence of the foundation pit is reasonable, which effectively solves the problem of insufficient construction site; (3) Due to the restrictions of the station construction site and the high voltage line above the station, the large-scale lifting equipment can not be installed , Shield U-turn can only be carried out in the station, the station U-turn programs were described in detail, and pointed out the design of the program points.
其他文献
通过对CRTS I型板无砟轨道板布板方法的介绍,让后期技术管理者对CRTS I型无砟轨道布板规则上有一个系统的了解,从梁缝测量、内业数据处理、再到布板方法详细计算,都是以现场
在文化人类学的视野中.藏族音乐、舞蹈等艺术是文化的象征。它包括两个层面的内容:一是艺术本身。它外显为独特的技术与艺术形态:二是这些技术和艺术形态背后内隐的民族文化价值
随着我国桥梁建设技术的不断发展,国内跨江河、跨海峡的大型桥梁建设越来越多,深水基础钻孔桩施工是大跨度桥梁施工的关键技术,而桩基工作平台的设计与施工更是其中的难点,它
综合应用钢花管及袖阀管的灌浆工艺,采用了砂浆、水泥浆等复合浆液配方,有效地处理了含有不同充填物的溶(土)洞,为桩基在岩溶发育地区的应用提供了保证,施工中取得了较好效果。
目前,南海垃圾焚烧发电项目公司为南海绿电再生能源有限公司,注册资本为500万元人民币,南海发展出资350万元;佛山市南海联达投资(控股)有限公司出资150万元。根据南海垃圾焚烧发电
高等数学是大学理工科及经济学专业的一门基础课,为教好和学好它,对教学原则进行探讨很有必要.教学原则可分理论课与习题课并重的原则;单项训练与综合训练相互结合的原则;经
第一章 总则 第1条行政院环境保护署(以下简称本署)为执行鼓励公民营机构建设运营垃圾焚烧厂推动方案(以下简称推动方案),提供主管机关作业之依据,特订本办法。第2条本办法专用名词
处于社会转型期的我国亟需政治意识形态的科学传导.政治传导包括政治传播、政治引导、政治倾向和政治整合等多重涵义,是导向的政治传播和政治传播的导向的有机结合.政治传导
9月9日-11日,中国建筑文化研究会成立大会暨首届当代中国建筑文化论坛在初秋的杭州西子湖畔成功召开,全国政协常委,教科文卫体委员会主任,原文化部部长刘忠德,建设部副部长黄卫出
针对垃圾焚烧进料称量过程中存在的问题,提出了解决办法并进行了试验研究。