论文部分内容阅读
为保证热水供暖系统的正常运行,除在设计中认真进行水力计算,正确选择各主支管管径,保证流量的合理分配,采取排气措施外,还应在施工过程中严格质量监督,消除施工缺陷,严格进行交工调试。在运行调试中,采用排除积存空气,近端关小阀门开度或力。装调压孔板,拆除或冲洗发生淤塞的管段和散热器等措施。
In order to ensure the normal operation of the hot water heating system, in addition to the careful calculation of water in the design, the correct selection of the diameters of the main branch pipes, the reasonable distribution of the flow rate, and the adoption of exhaust measures, it is also necessary to strictly supervise the quality control in the construction process. Construction defects, strict commissioning. In the operation and debugging, the exhaust air is removed and the valve opening or force is closed at the proximal end. Adjust the pressure plate, remove or flush the blocked pipe section and radiator.