论文部分内容阅读
本文对中满春花苑商住楼施工技术进行论述,通过轴线测设、高程测量等施工测量控制,沉降观测、倾斜观测等变形观测控制,降水、土方开挖、护坡、土方回填等土方相关工程施工,模板工程立模、固定方法,钢筋工程的钢筋加工、安装及焊接,混凝土工程的运输、浇筑及施工控制,、砌体工程的填充墙、加气砼砌块砌筑方法,垂直运输工程的塔吊、双笼施工升降机设备配置等主要工程的施工控制,确保了中满春花苑项目商住楼9#、10#楼于2014年4月16日、2014年5月16日主体结构顺利封顶。
In this paper, the construction technology of Zhong Manchun Garden commercial and residential building is discussed. Through earthquakes such as construction survey control such as axis survey and elevation measurement, deformation observation control such as settlement observation and slope observation, precipitation, earthwork excavation, slope protection and earthwork backfilling Engineering Construction, Formwork Engineering Legislation, Fixation Methods, Reinforcement Processing, Installation and Welding of Reinforcement Engineering, Transportation, Pouring and Construction Control of Concrete Works, Filling Walls for Masonry Works, Masonry Building Methods for Aerated Concrete Blocks, Vertical Transport The construction control of the main works such as the tower cranes of the project and the equipment configuration of double-cage construction elevators ensured the construction of No. 9 and No. 10 commercial and commercial buildings of Zhongchunchun Garden Project on April 16, 2014 and May 16, 2014. Smooth cap.