Improving construction performance through supply chain management

来源 :哈尔滨工业大学学报:英文版 | 被引量 : 0次 | 上传用户:cythcle
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
A typical model of construction supply chain (CSC) is presented firstly. Then the characteristics and problems of CSC are identified. The authors also describe the progress towards adoption of supply chain management (SCM) in the construction industry. Tr
其他文献
所谓唱空或做空,通俗地讲就是以众口铄金或投机取巧之法来唱垮或做垮一个国家或地区的经济.中国在这方面所面临的,就是连普通老百姓都已经耳熟能详的"中国经济崩溃论".三番五
期刊
Whether the breakdown structure and coding system of construction projects are reasonable or not determines to a large degree the pepfofmance level of the entir
In order to find out the applicability of the optimal pricing decision model based on conventional costbehavior model after activity-based costing has given str
Multimodality image registration and fusion are essential steps in building 3-D models from remotesensing data. We present in this paper a neural network techni
类公益信托在我国从法律支持、公众认知到实践创新等各方面都还相对落后,但这些不足恰恰是类公益信托在我国未来能够蓬勃发展的重要因素。
The application of multi-level fuzzy comprehensive appraisal on social effects of projects has been studied. The principles for setting up an index system have
The paper briefly addresses DLR' s ( German Aerospace Center) expertise in space robotics by handof corresponding milestone projects including systems on th
创造亮点,关键在于突出重点,围绕重点创亮点。要破常规、走新路,提出新思路、新举措、新抓手、新载体,创造性地做好每一项工作,真正实现发改工作亮点纷呈
期刊
在当前贸易保护主义抬头和全球价值链(GVC)兴起的现实背景下,产业升级不仅仅是从低附加值产业转向高附加值产业,更是产业内的生产链段的延长,从低附加值链段转向高价值链段。
It is only an assumption to simplify the reality that there is no contact force between cracks. In many cases, unilateral crack may be more close to reality, i.