论文部分内容阅读
通过分析混凝土表面覆盖延迟碳化的机理和对比几种覆盖材料,选用环氧砂浆对尖岗水库泄洪道与泄洪洞进行了防碳化处理,文中介绍了具体的施工措施和工程中发现的问题,希望对从事混凝土碳化研究和施工的技术人员有所帮助。
By analyzing the mechanism of delayed carbonation on the surface of concrete and comparing several kinds of covering materials, epoxy mortar was chosen to prevent carbonation of the spillway and spillway tunnels of the Jiangyang Reservoir. Concrete construction measures and problems discovered in the project were introduced To engage in concrete carbonization research and construction of technical staff to help.