华侨新村位于洛阳市涧西区,占地4.41公顷,总建筑面积5.46万平方米,由机械电子工业部第四设计研究院规划、设计;中房洛阳公司开发建设。小区1990年底动工兴建,1992年7月完工并投入使用,历时1年零7个月。华侨新村的规划设计,遵从城市总体规划,借用古典园林的布局手法,
Huaqiao Xincun is located in the west of Luoyang City, covering an area of 4.41 hectares and a total construction area of 54,600 square meters. It is planned and designed by the Fourth Design and Research Institute of the Ministry of Machinery and Electronic Industry; Zhongfang Luoyang Company is developing and constructing. The district started construction at the end of 1990 and was completed and put into use in July 1992. It lasted 1 year and 7 months. The planning and design of Huaqiao New Village follows the overall planning of the city and borrows the layout of classical gardens.