大跨度整体预应力板柱结构体系的施工新工艺 升板、整体预应力施工

来源 :建筑机械化 | 被引量 : 0次 | 上传用户:hnlh007
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
整体预应力板柱结构体系采用预制整间大楼板,楼板四角留有直角缺口,与柱角的两个侧面相邻。楼板与柱之间留有2~3厘米空隙,填入早强水泥砂浆,通过板间明槽及柱上预留孔道穿入高强钢丝束,然后以整个建筑平面为单元施加预应力,将柱之间的简支楼板与柱组装起来,在板柱间形成摩擦平接接头,再进行孔道灌浆以及灌注板间明槽 The whole prestressed slab column system adopts a prefabricated whole building slab, and the square corners of the slab leave a right angle notch, adjacent to the two sides of the column corner. Between the slab and the column, there is a gap of 2 to 3 cm. Fill in the early-strength cement mortar. Pass high-strength wire bundles through the open channel between the plate and the reserved holes on the column. Then apply prestress to the entire building plane as a unit. The simple support between the floor and the column is assembled to form frictional butt joints between the columns and columns, and then the channel grouting and pouring of the open slot between the plates
其他文献
本文的目的是推导求非弹性结构的反应统计量和在给定时间内结构超过某极限状态的破坏概率的解析方法,内容包括:滞变恢复力的模型化,结构框架的模型化,等效线性化法的反应分
金星岭竖井采用地面预注浆法堵塞裂隙涌水和加固岩层,取得了较好的效果。竖井净径5米,最大深度为379米。于1961年7月开工,用普通方法下掘16.83米,由于该矿区水文地质及工程
一、绩效沟通案例某集团公司某部门共有员工20人,设有四个小组,每个小组设有1名小组长。该部门自2013年开始,绩效管理工作以季度为周期,即每季度末月20日至次季度首月10日之
冲床必须有人身安全保护装置(简称安全装置),这在国外已有法律规定。例如日本制订的“劳动安全、卫生法规”和美国职业安全和健康署制订的“职业安全和健康条例(OSHA)”对此
编辑老师:您好。《语文建设》是我最喜欢的语文期刊之一。每期必看,获益匪浅。2011年的第1期,我重点看了《开设书法课,传承汉字文化》《语文人生:在沉思与 Edit teacher: He
《广西林业科学》是广西林业科学研究院主办的综合性林业科技刊物。1971年创刊,季刊,公开发行,国内统一刊号CN45-1212/S,国际刊号ISSN1006-1126。主要栏目有:学术园地、科技
重钢某车间钢锭跨,厂房跨度30米,有3×10吨重级制吊车,吊车轨面标高8米,厂房下弦标高10.9米。厂房建筑在砂岩地层上。在这种天然优质岩基上建厂房,能不能取消阶梯式基础,尽
1.碳酸氢铵。为白色固体,易挥发;具有氨的臭味,易溶于水,呈碱性反应。灼烧反应不熔化,直接气化但无白烟,有微弱的爆裂声。2.硝酸铵。为白色晶粒,易吸湿结块,易溶 Ammonium b
湖南省南县农机部门充分发挥自身农机优势,积极组织人力、物力、财力为正在进行的水利冬修服务,收到了良好的效果。2001年水利冬修一开始,南县农机部门便积极组织拖拉机、翻斗车上施
理论分析本文所用的有限元分析的模型与墙体的尺寸示于图1和表1。把墙和其它构件划分为矩形单元,其中柱单元尺寸的确定原则,应使柱得到均匀的应力分布。各种材料的性能列于