本文突破传统仅依靠经验进行施工管理的模式,结合项目管理中进度优化和控制的相关理论知识,通过关键路径法、数学建模、LINGO软件等先进技术和方法,对人力资源有限的道路工程施工项目以及施工进度进行优化,解决了当前施工过程中人力资源有限的情况下,最大程度减少项目成本和确保施工工期,为工程技术人员、管理人员和决策人员提供科学的理论分析方法和先进的技术手段。借助现代计算机技术,推动公路工程施工组织设计和建设管理向更科学、更系统、更现代的方向发展。
This paper breaks through the traditional model of construction management based on experience only. Combining with the related theoretical knowledge of progress optimization and control in project management, through the advanced technologies and methods such as critical path method, mathematical modeling and LINGO software, Projects and construction progress to solve the current construction process limited human resources circumstances, minimize project costs and ensure the construction period for engineering and technical personnel, managers and decision-makers to provide scientific and theoretical analysis methods and advanced technology means. With the aid of modern computer technology, promote the construction design and construction management of highway construction to a more scientific, systematic and modern direction.