论文部分内容阅读
一、工程简介该旅馆位于大连,建筑面积16828M~2,主楼16层,地下二层,地下第一层是汽车库,发电机房,配电室,消防控制室,消防水泵房,风机室,加热罐室。地下第二层是人防,电话总机室设在一二层间的夹层内。十五层上部有一层是设备层。三个电梯井道,一个管道井,一个电气管线井,这些井道均设楼的中间部位。该旅馆主体高52.8米,属一类民用建筑,其消防用电属一级负荷,需要两个独立电源,根据当地条件,只能由柴油发电机作备用电源。正常电源停电时,柴油发电机自起动并在末级配电箱处自动切换。以保证消防设备的不间断供电。
I. Project Introduction The hotel is located in Dalian, with a building area of 16828M~2, 16th floor of the main building, and the second underground floor. The first underground floor is the garage, generator room, power distribution room, fire control room, fire pump room, fan room, heating Tank room. The second floor of the basement is air defense. The telephone exchange is located in a mezzanine between the two floors. The upper layer of the fifteenth floor is the equipment layer. Three elevator shafts, one pipe well, and one electric pipe well, all of which are located in the middle of the building. The main body of the hotel is 52.8 meters high and belongs to a class of civil buildings. Its fire-fighting electricity is a first-class load and requires two independent power sources. According to local conditions, diesel generators can only be used as standby power. When the normal power is cut off, the diesel generator starts automatically and switches automatically at the final distribution box. To ensure the uninterrupted power supply of fire fighting equipment.