论文部分内容阅读
宁德市金溪防洪一期工程C1标段施工过程中,由于区域块石原料短缺,远距离调运石材造价突破严重,工程被迫停工。施工项目部提出利用当地河滩卵石代替块石的细石混凝土砌卵石挡土墙设计方案调整建议,有效控制了项目建设成本、质量,确保了防洪工程按期投入使用。该文对此进行了总结,供相似工程参考。
Ningde Jinxi flood control C1 project during the first phase of construction, due to the shortage of raw materials in the region block, long-distance transportation of stone cost breakthrough serious, the project was forced to suspend work. The construction project department put forward the proposal of adjusting the design proposal of the fine stone masonry masonry retaining wall using the local beach gravel instead of the block stone, effectively controlling the project construction cost and quality, and ensuring that the flood control project is put into operation on schedule. This article summarizes this for reference to similar projects.