在我国国民经济的持续,快速发展过程中,体育事业也在蓬勃发展,各大城市体育馆相继建成投入使用。由于体育馆工程结构超长、超宽、大面积的特殊性,许多体育馆混凝土结构在建设过程和使用过程中出现了不同程度,不同形式的裂缝,它是长期困扰着建筑工程技术人员的技术难题。本文针对这种普遍存在的现象结合湘潭电机综合体育馆工程实例,对超长混凝土结构施工工程,采取了一些相关控制措施,取得效果良好,可供同行参考。
In the continuous and rapid development of our national economy, the sports industry is also booming. The sports centers in major cities have been put into operation one after another. Due to the long, wide and large area of stadium construction, many gymnasium concrete structures have different degrees and different forms of cracks in the construction process and the use process, which is a technical problem that plagued the construction technicians for a long time. This article in view of this ubiquitous phenomenon combined with the Xiangtan Electric General Gymnasium project example, for the super-long concrete structure construction project, take some relevant control measures, achieved good results, for peer reference.