为满足鹤壁电厂扩建工程三期2×600MW机组的燃料运输,在原有铁路站场的基础上进行改造,本着尽量减少影响既有电厂一、二期燃煤运输的原则,对三期卸煤线施工影响既有线路的实际运营情况进行认真分析和比选,最终确定了实施困难条件下的改造方案,实施效果良好,经济效益显著。
To meet the Hebi power plant expansion project three 2 × 600MW unit of fuel transport in the original railway station yard based on the transformation, in line with minimizing the impact of existing power plant one or two coal transport principles, the three unloading coal The construction of the line affected the actual operation of the existing lines to carry out careful analysis and comparison, and finally determined the transformation plan under the difficult conditions of implementation. The implementation effect is good and the economic benefits are remarkable.