论文部分内容阅读
本文简要论述了高层建筑大体积砼的温度预测、现场监测及温度控制措施,提出了温度裂缝控制的基本对策,可供当前大体积砼的施工作参考。
This article briefly discusses the temperature prediction, on-site monitoring and temperature control measures of high-mass concrete large-scale rafts, and puts forward the basic countermeasures for temperature crack control, which can be used as a reference for the current large-scale radon construction work.