因城际铁路施工,需接长京沪线下行K1440_(+500)K1440_(+771)既有桥涵。为确保既有京沪铁路行车安全,根据桥涵现场实际条件,采用D16m便梁预防性加固线路。由于不掏空线路,只是对线路的路基进行预防性加固。为此,特制定砼简易支墩便梁架设施工方案,确保提速区段桥梁设备和行车安全。
Due to the construction of the inter-city railway, it needs to take the long line of Beijing-Shanghai down K1440 _ (+500) K1440 _ (+771) existing bridges and culverts. In order to ensure the traffic safety of both the Beijing-Shanghai railway, the D16m free-standing beam is used to prevent reinforcement according to the actual conditions of the bridge and culvert. Because it is not hollowed out the line, but for preventive reinforcement of the roadbed. To this end, specially formulated simple concrete pillars will be erected erection program to ensure speeding section bridge equipment and traffic safety.