【摘 要】
:
一、前言1978年夏开始在试验室里进行两板两楔组装法的试验研究,1980年首先在鞍钢Zx11.4铁壳帽上进行了两板两楔法试生产,效果良好,转角部位不易渗入钢水。于是,1981年又将
论文部分内容阅读
一、前言1978年夏开始在试验室里进行两板两楔组装法的试验研究,1980年首先在鞍钢Zx11.4铁壳帽上进行了两板两楔法试生产,效果良好,转角部位不易渗入钢水。于是,1981年又将 Fx7.1模子的绝热板板型由四板插挤组装法改为两板两楔组装法。1982年春在 Zx13.1铁壳帽上亦采用了两板两楔组装法。鞍钢目前在大生产中全部采用两板两楔组装绝热板。
I. Introduction In the summer of 1978, experimental research on the assembly of two plates and two wedges was carried out in the summer of 1978. Trial production of two plates and two wedges was first carried out on the Zx11.4 steel cap in Anshan Iron and Steel Co., Ltd. in 1980 with good effect and the corner parts were not easy Infiltration of molten steel. Thus, in 1981 and Fx7.1 mold insulation board from the four-pin extrusion assembly method into two plates two wedge assembly method. The spring of 1982 in the Zx13.1 iron cap also used two plates and two wedge assembly method. Anshan Iron and Steel in the current production of all the two panels with two wedge assembly insulation board.
其他文献
在欧洲地震委员会和欧洲地球物理协会会议期间(1978年8月29日-9月5日),在斯特拉斯堡召开了关于“监视地震区的地壳动力学”国际会议,这次会议是由欧洲地震委员会的“地球动
我厂是苏修设计的,其设备是傻、大、黑、粗、洋。以前我们受修正主义办企业路线“设备到顶论”的影响,认为设备已经很先进了,没有什么可改的。因此从来没有对设备进行过改造
以市长孙清云为团长的西安市政府代表团8月6日启程,随陕西省党政代表团前往珠江三角洲地区进行学习考察和招商引资。这是我市继长三角招商以后又一次重要的招商活动。代表团
提高测量精度,降低测量误差,除注意正确测试方法的研究外,研制性能精良的测量设备,似乎是以往人们采取的唯一办法。最佳估值理论的引入,能否在现有测量技术条件下提高测量结
6吨铲车变速箱中碟形磨擦片如图1(α)所示,材料为65Mn,要求硬度为 HRC45~48。热处理前,车出两端面,并留0.15毫米磨量,热处理后要求成碟形(0.5~0.6毫米),如图1(b)所示.根据上述
决策失误、工作仓促、设计、管理施工方面的不足及材料设备不满足等原因直接影响公路工程质量的因素。
Decision-making mistakes, work rush, design, management and cons
HAVING arrived in Heze,Shandong Province by Beijing-Kowloon Railway, we heard of asmall village called Wulidun. It thrives asa highly proficient farm productio
请下载后查看,本文暂不支持在线获取查看简介。贺岁电视剧《家和万事兴》之双喜临门
Please download to view, this article does not support online access to view profi
电视连续剧《红楼梦》第三回林黛玉初入荣国府一场戏中,当贾宝玉了解到林黛玉没有像自己脖子上带的这块玉时,气得把玉狠命往地下一摔,骂道:“要这劳什子做甚?”可当贾宝玉
T
在桥梁建造和使用过程中,有关因出现裂缝而影响工程质量的报道屡见不鲜。其实,如果采取一定的设计和施工措施,很多裂缝是可以克服和控制的。为了进一步加强对混凝土桥梁裂缝