论文部分内容阅读
本文简述主要由美国引进的第一台600MW空气预热器漏风控制系统的性能和特点,重点介绍了该套系统冷、热态调试措施,并提出了在调试中值得注意的若干问题。
This article briefly describes the performance and features of the first 600MW air preheater air leakage control system introduced mainly by the United States. The cold and hot adjustment measures of the system are introduced emphatically, and some problems that are worth noting in the debugging are put forward.