一、工程概况枫树坝位于广东省龙川县内东江上游,距县城老隆64公里.坝址岩性为安山玢岩,基本烈度为Ⅶ度,设防烈度为Ⅷ度.水库正常高水位为166米高程,相应库容15.4亿米~3.电站实际装机容量为16万千瓦,年平均发电量为6.06亿度.该坝坝型较复杂,由混凝土实体重力坝,空腹重力坝和宽缝重力坝三种坝墩构成.空腹重力坝内设厂房和变电站.坝顶长400米,宽度为6.5米,最高坝墩为95.3米.全坝分为三部分:0~#—5~#坝墩为右岸挡水段,
I. Project Overview Maple dam is located in Longjiang County, Guangdong Province, the upper reaches of the Dongjiang River, 64 kilometers from the county Laolong. Dam rock for the Anshan rock, the basic intensity of Ⅶ degrees, fortification intensity of Ⅷ degrees. Normal high water level reservoir 166 meters elevation, the corresponding storage capacity of 1.54 billion meters to 3. The actual installed capacity of 160,000 kilowatts power plants, the average annual generating capacity of 606 million degrees. The dam dam is more complex by the concrete gravity dam, fasting gravity dam and wide seam Gravity dam three kinds of dam pier composition.Fast abdominal gravity dam is equipped with plant and substation.The crest is 400 meters long and the width is 6.5 meters, the highest dam is 95.3 meters.The whole dam is divided into three parts: 0 ~ # -5 ~ # dam Pier for the right bank retaining section,