论文部分内容阅读
“游泳池反应堆控制保护系统安全整治工程”应用现代测控技术,严格遵照核安全法规标准进行设计、制造、安装、调试,建成了一个先进的试验堆控制保护系统。新系统增设和完善了保护变量与保护设备;监测装置的灵敏度提高了1~2个量级;停堆状况下有5个独立的监测装置同时指示堆功率,稳定性与抗干扰性能好。全新的自动功率调节系
“Pool Reactor Control and Protection System Security Remediation Project” application of modern measurement and control technology, in strict compliance with nuclear safety regulations and standards for the design, manufacture, installation, commissioning, built an advanced pilot reactor control and protection system. The new system has added and improved protection variables and protection equipment; the sensitivity of the monitoring device has been increased by 1-2 orders of magnitude; and five independent monitoring devices in the shutdown condition indicate heap power with good stability and anti-interference performance. New automatic power regulation system