Novel modeling on numerical computing the geo-deformation information in coalmine based on the GIS-E

来源 :High Technology Letters | 被引量 : 0次 | 上传用户:jayzhoujian
下载到本地 , 更方便阅读
声明 : 本文档内容版权归属内容提供方 , 如果您对本文有版权争议 , 可与客服联系进行内容授权或下架
论文部分内容阅读
Numerical simulation modeling is a hotspot in the geological engineering computing field.Taking a fast Langrangian analysis of continua in 3 dimensions(FLAC) numerical modeling on computing the geo-deformation information caused by the mining subsidence in a coalmine for example,a new GIS-Excel modeling method is proposed to build geologic strata within the simulation range combined with the coal-seam dip angle of the underground mining working-planes.First of all,the coal-seam model of the numerical computing is built by using the geographic information system(GIS) according to the stripe-through principle and the calculating formula on the size of the model blocks in the paper defined,then the FLAC~(3D) numerical computing model of all geologic strata within the simulation range is also built based on the calculating formula of thickness of each stratum and the Excel fast computing advantages.The GIS-Excel method is good at the higher modeling accuracy,seldom making mistakes and consuming less time.The reliability and validity of the method is verified well by its practical applications in the coalmine area. Numerical simulation modeling is a hotspot in the geological engineering computing field. Testing a fast Langrangian analysis of continua in 3 dimensions (FLAC) numerical modeling on computing the geo-deformation information caused by the mining subsidence in a coalmine for example, a new GIS- Excel modeling method is proposed to build geologic strata within the simulation range combined with the coal-seam dip angle of the underground mining working-planes. First of all, the coal-seam model of the numerical computing is built by using the geographic information system (GIS) according to the stripe-through principle and the calculating formula on the size of the model blocks in the paper defined, then the FLAC ~ (3D) numerical computing model of all geologic strata within the simulation range is also built based on the calculating formula of thickness of each stratum and the Excel fast computing advantages. GIS-Excel method is good at the higher modeling accuracy, seldom making mistakes and cons uming less time. reliability and validity of the method is verified by its practical applications in the coalmine area.
其他文献
X-431 PRO3S系列是元征科技针对互联网应用而开发的基于Android系统的新型汽车故障诊断设备,具有覆盖车型广、测试功能强大、特殊功能多及测试数据准确等诸多优点。本文将介
随着世界一体化、经济全球化,英语学习为越来越多的人所重视。但制约英语学习的问题究竟在哪里?在英语学习过程中我们具备的哪些能力比较重要?我们又该如何有效的改善提高这
摘 要 在当前恶意欠薪愈演愈烈的情况下,随着刑法修正案将恶意欠薪问题纳入刑法规制的范围,使得学术界广泛讨论恶意欠薪是否应当入刑的问题最终落下帷幕,但是由于法律的不完善以及滞后性等原因,恶意欠薪入刑并没有能完全解决这一社会问题。本文将结合恶意欠薪罪的内容将这一罪名的相关问题逐一分析,提出相关建议,为该罪名的完善略尽绵薄之力。  关键词 恶意欠薪 劳动者 用人单位 司法机关  作者简介:刘爱玲,广西大
本文针对石油化工易燃易爆的特点,介绍了电气防爆的划分标准,各种防爆技术及其原理、对比了中国和北美的防爆标准、并指出自控设计中需要重点注意的事项。
世界领先的特种化学品公司Clariant公司于2017年3月14日宣布推出新一代高性能蒸汽重整催化剂,用于生产氢气、氨和甲醇。新的ReforMax 330LDP Plus和ReforMax 210LDP Plus催化
荣成市技工学校在下岗职工较多,下岗人员原有技术不能满足转岗转业需要的情况下,坚持培训为就业服务的指导思想,培养了一批一专多能的技术人才。一、开展短期培训工作,免费
It was the last day of the final examination in a college.On the steps of building,a group of engineering students were waiting for the last exam. On their face
Lack of mucoadhesive properties is the major drawback to poloxamer 407(F127)-based in situ hydrogels for mucosal administration. The objective of the present st
石油化工产业中会使用大量电气设备在内的供电系统来维持正常的运转,在生产经营中,电力系统的安全至关重要,为了保障电气设备不受浪涌的冲击和影响,通常会使用避雷器,也就是
4月1日江苏省高校人事制度进行重大改革。今年将着重做好精简机构、推行全员聘用制,加大分配制度改革,突出师资队伍建设的工作。4月2日报载,“长江学者奖励计试”首批特聘教授授